




Andy makes little boxes to house the duct ends so that they can be shoogled in the floorslab if required to ease the pipe work installation later on.
Next, the essential digger arrives. It is an orange mean machine that's ready for anything.
The last essential ingredient is to check the plans and then James and Andy are ready to translate the plans into something concrete.
Finally, we've turned the tide from destruction to construction as the first of the trenches is dug.
The work progresses, is it a battle of man versus machine? Is Andy trying to tame a large orange dinosaur? Or is Andy showing James that he trusts him not to remove his feet?
And so the first day of construction ends with trenches all over the ground looking like an archeological dig. A bit of old water mains pipe was found but unfortunately no buried treasure.